Geo‑INQUIRE Horizon Europe project. D2.6 WP2 Status of research infrastructures at M30

Authors

Reitano,  Danilo
Geo-INQUIRE, External Organizations;
INGV;

Pedersen,  Helle
Geo-INQUIRE, External Organizations;
CNRS;

/persons/resource/strollo

Strollo,  Angelo       
2.4 Seismology, 2.0 Geophysics, Departments, GFZ Publication Database, GFZ Helmholtz Centre for Geosciences;
Geo-INQUIRE, External Organizations;

External Resource
No external resources are shared
Fulltext (restricted access)
There are currently no full texts shared for your IP range.
Fulltext (public)

Geo-INQUIRE_D2.6.pdf
(Publisher version), 820KB

Supplementary Material (public)
There is no public supplementary material available
Citation

Reitano, D., Pedersen, H., Strollo, A. (2025): Geo‑INQUIRE Horizon Europe project. D2.6 WP2 Status of research infrastructures at M30, Potsdam : GFZ Helmholtz Centre for Geosciences, 31 p.
https://doi.org/10.48440/v2as-cb88


Cite as: https://gfzpublic.gfz.de/pubman/item/item_5038317
Abstract
This Deliverable describes the status at M30 (March 2025) of the Research Infrastructures that are namely referred to the Geo-INQUIRE Work Package. Information in the Deliverable is organized into three main topics:
− Updated status within the installations from M19 to M30
− KPIs “Service Status”
− Activities of WP2 that are strictly connected to other WPs in the project.
About half of the life cycle of the Geo-INQUIRE project, WP2 continues to manage the work of integrating, harmonizing and thus releasing new datasets coming from different domains, since the following research infrastructures contribute to WP2: ORFEUS-EIDA waveform services within the EPOS Thematic Core Service (TCS) for Seismology; EPOS TCS GNSS; EMSO (European Multidisciplinary Seafloor and water column Observatory); UNESCO/IOC/Sea Level Station Monitoring Facility (SLSMF) & EPOS TCS Tsunami; EPOS Near Fault Observatories (NFO) and EPOS Volcanic Observations (VOLC). At the time of present writing the overall progress of WP2 is reported fully on target with most of the activities in line with Deliverables and Milestones scheduled timeline. The achieved results can be also available in the form of “services” provided by the different Community Data Portals better described in the Annex 1. Key information is provided by WP2 Task Leaders, and all is referred to a 12 months’ time slot with the aim to outline the progress reached in the project and communicated to stakeholders through this document.