English
 
Privacy Policy Disclaimer
  Advanced SearchBrowse

Item

ITEM ACTIONSEXPORT
 
 
DownloadE-Mail
  Drilling and Abandonment Preparation of CO2 storage wells – Experience from the Ketzin pilot site

Prevedel, B., Martens, S., Norden, B., Henninges, J., Freifeld, B. M. (2014): Drilling and Abandonment Preparation of CO2 storage wells – Experience from the Ketzin pilot site. - Energy Procedia, 63, 6067-6078.
https://doi.org/10.1016/j.egypro.2014.11.639

Item is

Files

show Files
hide Files
:
838918.pdf (Publisher version), 5MB
Name:
838918.pdf
Description:
-
OA-Status:
Visibility:
Public
MIME-Type / Checksum:
application/pdf / [MD5]
Technical Metadata:
Copyright Date:
-
Copyright Info:
-
License:
-

Locators

show

Creators

show
hide
 Creators:
Prevedel, Bernhard1, Author           
Martens, S.2, Author           
Norden, Ben3, Author                 
Henninges, J.3, Author                 
Freifeld, Barry M.4, Author
Affiliations:
1WB Scientific Drilling, Scientific Infrastructure and Plattforms, GFZ Publication Database, Deutsches GeoForschungsZentrum, ou_146060              
2CGS Centre for Geological Storage, Geoengineering Centres, GFZ Publication Database, Deutsches GeoForschungsZentrum, ou_146050              
34.1 Reservoir Technologies, 4.0 Chemistry and Material Cycles, Departments, GFZ Publication Database, Deutsches GeoForschungsZentrum, ou_146039              
4External Organizations, ou_persistent22              

Content

show
hide
Free keywords: Well design; Permanent down-hole monitoring; Mud losses; Cementation; Perforation; Abandonment; Well killing
 Abstract: At Ketzin, located west of Berlin, the GFZ German Centre for Geosciences is operating Europe's largest CO2 research storage site. This pilot site has been developed since 2004 and is comprised of one combined injection/observation well and four monitoring wells. From June 2008 to August 2013, a total of 67 kilotons of CO2 were safely injected into the sandstone units of the Upper Triassic Stuttgart Formation in a depth between 630 to 650 m. The paper discusses the well designs and lessons learned in drilling engineering and operations. The abandonment phase started in Ketzin with the first plug cementation of the observation well Ktzi 202 shortly after shut-in of CO2 injection. The experience with the first CO2 well killing operation will be reviewed.

Details

show
hide
Language(s):
 Dates: 2014
 Publication Status: Finally published
 Pages: -
 Publishing info: -
 Table of Contents: -
 Rev. Type: -
 Degree: -

Event

show

Legal Case

show

Project information

show

Source 1

show
hide
Title: Energy Procedia
Source Genre: Journal, Scopus, oa
 Creator(s):
Affiliations:
Publ. Info: -
Pages: - Volume / Issue: 63 Sequence Number: - Start / End Page: 6067 - 6078 Identifier: CoNE: https://gfzpublic.gfz.de/cone/journals/resource/journals2_134